Portfolios

Ongoing Projects

#Name of Work or SupplyProjected Completion DateDivisionYear
1Upgrading Karnaphuli Tunnel Connecting Road Shikolbaha-Anowara National Highway N-115 to 4-Lane with slow moving vehicle lanes including widening road embankment and tree plantation at median under Dohazari Road division during the year 2020-2021 WP-01.6/13/2023Dohazari 2023
2Construction of 391.34 m. 9 x 42.68m. P.C Girder Long Bridge Muhuri Bridge at 30th km. ch. 29575m. on Feni-Sonagazi-Muhuri Project Road Z-1034 under Feni Road Division during the year 2019-2020.6/3/2023Feni2023
3Improvement work of Ekota Bazar to BNS Sheikh Hasina Base Road (Z-1125) (Chainage: 12+300 to 23+000) by Widening road embankment, widening and strengthening of existing road woth surfacing construction of new pavement, construction of Rigid Pavement , Construction of RCC Box Culvert and other ancillary works under Cox's Bazar Road Division during the year 2019-20206/24/2023Cox's Bazar2023
4Construction 2 Lane 8 Nos & 4 Lane 2 Nos Bridges including approach & protective works etc. at different KM & Chainage of 4-Laning improvement profect of Chattogram-Rangamati National Highway (N-106) (Hathazari-Raozan Portion) under Chattogram Road Division during the year 2018-2019.4/20/2023Chattogram2023
5Widening & strengthening of existing pavement Earthwork, Construction of Rigid pavement & RCC Box Culvert at 50th (p) km to 66th (p) km on Mymensingh (Raghurampur - Phulpur - Nakla - Sherpur (R-371) Road under Road Division, Sherpur during the year 2019-2020 [PW-06]3/7/2023Sherpur2023
6Development of Bir Muktijodha Marhum Hazi Kamaluddin (Begumgonj-Kabirhat) Road (Z-1453) at 7th Km (P) to 17th Km (P) by Widening, Strengthening, DBS Wearing Course, Construction of 14 Nos. Different Size RCC Box Culvert, Road Side Drain & Protective works under Noakhali Road Division during the year 2020-2021. 4/24/2023Noakhali2023
71. Improvement of Drownkhali Nalbonia (Janab Ali Road) Road by RCC Work from Ch.0.0-925.0m, ( Road ID : 422944001) including 02 nos X-drain, 89.0m RCC U-drain & 224.0m Protection work by Palisading & Brick toe wall. 2. Improvement of Mariccha G.C-Lambori Para via Gorirdip Road by RCC Work from Ch.1207-2935.0m, ( Road ID: 422944003 ), including 02 nos. Box culvert of size 1v x 2.5m x 2.5m, 01 No. of size 1v x 2.0 x 2.0m, 07 nos X-drain & 1472.0m Protection work by L-drain & toe wall. 3. Improvement of Gilatali-Maskaria Modhuchora Road by RCC Work from Ch.0.0-2676.0m ( Road ID: 422944010), including 06 nos. Box culvert of size 1v x 3.0m x 2.5m, 01 No. of size 1v x 2.0 x 2.0m, 01 no. of size 2v x 2.5m x 2.5m, 03 nos X-drain, 75.0m U-drain & 2602.0m Protection work by Palisading L-drain toe wall & RCC Retaining wall. 4. Improvement of Dailpara Dagbanglow - Degolia Chack Boita Road by RCC Work from Ch 2465.0-3800.0m ( Road ID: 422944015 ), including 09 nos X-drain, 73.0m RCC U-drain & 587.0m Protection work by L-drain & Brick toe wall.Under Ukhiya Upazila District: Cox`s Bazar.3/16/2023Cox's Bazar2023
81. Improvement of Battali - Classipara Road by RCC Work from Ch 0-1475m, ( Road ID: 422944016 ) including 01 no of Culvert of size 1v x 4.0m x 4.5m, 01 no. of size 1v x 2.0m x 2.0m, 2 nos X-drain 97.0m RCC U-drain & 611.0m Protection work by L-drain & Brick toe wall. 2. Improvement of Ratnapalang Hill Tract Road by RCC Work from Ch. 0-1530 m,( Road ID: 422944017 ), including 02 nos. Box culvert of size 1v x 2.0m x 2.0m, 04 nos X-drain. 3. Improvement of Patabari Headman Road by RCC Work from Ch 0-1125m, ( Road ID: 422944019 ), including 03 Nos. Box culvert of size 1v x 2.0m x 2.0m, 01 nos X-drain, 35.0m RCC U-drain & 279.0m Protection work by L-drain & brick toe wall. 4. Improvement of Panishiya Graveyeard Road by RCC from Ch 0-1650m,( Road ID: 422944020 ), including 03 nos Box culvert of size 1v x 2.0m x 2.0m, 04 nos X-drain & 445.0m Protection work by L-drain Palisading & Brick toe wall. Under Ukhiya Upazila Dist: Cox`s Bazar.3/16/2023Cox's Bazar2023
91. Improvement of Panishia BGS Road by BC Work from Ch. 00-1600m,( Road ID: 422944021 ), including 02 nos. Box culvert of size 1v x 2.0m x 2.0m, 08 nos X-drain & 1571 .0m Plotection work by L-drain & toe wall. 2. Improvement of Dighirpara Holodia Road by BC Work from Ch. 00-1000m,( Road lD: 422944023 ), including 01 no. Box culvert of size 1v x 2.0m x 2.0m, 08 nos X-drain & 166.0m Protection work by palisading L-drain & Retainins wall. 3. Improvement of West Holodia Road by BC Work from Ch. 00-14l0m, ( Road ID: 422944025 ), including 02 nos. Box culvert of size 1v x 2.0m x 2.0m, 05 nos X-drain & 540.0m Protection work by Palisading L-drain & Toe wall. 4. Improvement of Hijolia Horinmara Road by BC Work from Ch. 2500-3960.0m,( Road ID: 422944005), including 01 no Box culverl of size 2v x 4.5m x 3.5m, 01 no of size 3v x 4.5 x 3.5m, 02 nos X-drain, 101.0m RCC U-drain & 1865.0m Protection work by Palisading Toe wall L drain & Retaining wall. 5. Improvement of Battala Dosari Road by BC Work from Ch. 00-1320.0m, ( Road ID: 422944006 ), including 02 nos Box culvert of size 1v x 2.0m x 2.0m, 01 no of size 1v x 3.0 x 3.0m, 01 no X-drain & 185.0m Protection work by Toe wall & Retaining wall. 6. Improvement of Badugona to Battali Road by BC Work from Ch. 00-1630.0m, ( Road ID: 422944026 ), including 04 nos Box culvert of size 1v x 2.0m x 2.0m, 05 nos X-drain,17.0m RCC U-drain & 519.0m Protection work by Palisading Toe wall L-drain & Retaining wall. 7. Improvernent of Jadimora-Harinrnara Road by BC Work frorn Ch. 00-1405.0m,( Road ID: 422944038), including 01 no Box culvert of size 1v x 2.0 x 2.0m, 01 no of size 1v x 3.0m x 4.0m, 01 no X-drain & 341.0m Protection work by Palisading Toe wall & RCC Retaining wall. Under Ukhiya Upazila Dist: Cox`s Bazar.3/16/2023Cox's Bazar2023
101. Improvement of Ukhiya darogabazar GC to Hijalia via Hatimora Road by BC Work from Ch. 00-2039m,( Road ID: 422944031 ), including 01 no Box culvert of size 1v x 2.0m x 2.0m, 04 nos of size 1v x 3.0 x 2.0m, 01 no of size 1v x 3.0 x 3.0m, 01 no X-drain, 61.0m RCC U-drain & 506.0m Protection work by L-drain toe wall & RCC Retaining wall. 2. Improvement of Nalbunia Primary School Road by BC Work frorn Ch. 00-810m,( Road ID: 422944032), including 03 nos Box culvert of size 1v x 2.0m x 2.0m, 05 no X-drain & 46.0m Protection work by Palisading work. 3. Improvement of West Diglia Road by BC Work from Ch. 00-1326m,( Road ID: 422944034), including 02 nos Box culvert of size 1v x 2.0m x 2.0m, 01 no X-drain & 466.0m Protection work by Palisading Toe wall & RCC Retainins wall. 4. lmprovement of Bottali Chagol bazar Road by BC Work Ch. 00-975.0m,( Road ID: 422944040), including 02 nos Box culvert of size 1v x 2.0m x 2.0m, 01 no X-drain & 270.0m Protection work by Palisading Toe wall & RCC Retaining wall. 5. Improvement of Ratnapalong-Boddho mondir Road by BC Work from Ch. 00- 1255.0m, ( Road ID: 422944062 ), including 02 nos. Box culvert of size 1v x 2.0m x 2.0m, 02 nos of size 1v x 4.5m x 3.5m and 01 no X-drain. 6. Improvement of Rumka-sabek Rumka primary school Road by BC Work from Ch.2100-5820.0m ( Road ID: 422944044) , including 04 nos Box culvert of size 1v x 2.0m x 2.0m, 12 nos X-drain & 826.0m Protection work by Palisading Toe wall & L-drain. Under Ukhiya Upazila Dist: Cox`s Bazar.3/16/2023Cox's Bazar2023
11Improvement of 1. Ratna Palong Holudia Road by BC from Ch.1100m - 2305m, Road ID: 422945003 . 2. Jautola Bhalukia Road by BC from Ch.00 -.810.0m, Road ID: 422945004. 3. Rumka-Rumka Bazar Road by BC from Ch.00 - 372.0m, Road ID: 422945005. 4. Ukhiya Malvita Road by BC from Ch.00 - 700.0m, Road ID: 422944054. 5. Sonaichari Thingapara Road by BC from Ch.00 - 845.0m, Road ID: 422945006. 6. North Sonaichari-West Sonaichari Road by BC from Ch 00 - 945.0m, Road ID: 422945018. 7. Lambari para Jame Mosque Road by BC from Ch 00 - 2340.00m, Road ID: 422945019. 8. Ghaltpara Holudia Road by BC from Ch 00 - 975.00m, Road ID: 422945025. 9. Bottoly-Pukuria Road by BC from Ch 00 - 2845.00m, Road ID: 422944060. 10. Telipara-Mazerpara Road by BC from Ch 00 - 2320.00m, Road ID: 422944050. 11. Ukhiya Hatimora Road by BC from Ch 2426 - 4972.0 m, Road ID: 422944058. 12. Shiler Chara Road by BC from Ch 00 -1517.00m, Road ID: 422945074. 13. Mohasen ali to Baggona Road by BC from Ch 00 - 1405.00m, Road ID: 422945078. 14. Bangamata Mohila Cillege to east Sikder bill Road by BC from Ch 00 -1228.00m. Road ID: 422945079. 15. Paglir bill Soya khola Road by BC from Ch 00 - 2310.0m, Road ID: 422945082. Including of 22 nos Box Culvert, 93 no X-Drain, 1703m RCC U-Drain & 10230m Protection Work on the above Roads, Under Ukhiya Upazila District: Cox`s Bazar.2/6/2023Cox's Bazar2023
12Construction of Flexible Pavement, Road Embankment, Rigid Pavement, Bus Bay, Protective work, RCC Drain, Saucer Drain, Sign Signal & 9nos RCC Box Culvert at 79th km to 97th km of Bhola(Porantalukderhat)-Borhanuddin-Lalmohon-Charfession-Charmanika Regional Highway (R 890) Under Bhola Road Division during the year 2020-20213/28/2023Bhola2023
13Improvement for 6-Laning of Narayangonj Link Road (R-111) (Signboard-Chasara) project consist of Construction of Flexible Pavement Rigid Pavement 3 nos Footover Bridge Service Lane Bus-Bay U-turn Drain with Footpath & 8 nos. Box-Culvert (Ch. 0+000 to 8+105 m.) under Road Division Narayngonj during the year 2020-2021. (Package WP-01).2/6/2023Narayanganj2023
14Widening of existing pavement Strengthening by providing Aggregate Base Type-I DBS Base Course Surfacing by DBS Wearing Course protective work by RCC palisiding Earth Work Installation of sign signal Km post & Guide post saucer drain and cross drain from Ch. 19+000 to Ch 38+000 of Matlab-Meghna-Dhonagoda-Beribadh Road Z-1069 under Road Division Chandpur during the year 2020-2021.4/21/2023Chandpur2023
15Widening of existing pavement Strengthening by providing Aggregate Base Type-I DBS Base Course Surfacing by DBS Wearing Course protective work by RCC palisiding Earth Work Installation of sign signal Km post & Guide post saucer drain and cross drain from Ch 0+000 to Ch 19+000 of Matlab-Meghna-Dhonagoda-Beribadh Road Z-1069 under Road Division Chandpur during the year 2020-2021.4/18/2023Chandpur2023
16Construction of rest Area with parking facilities on Dhaka (Kanchpur)- Bhairob-Jagadishpur-Shaistagonj-Sherpur- Syhlet-Tamabil-Jaflong (N2) (Road Circle Moulavibazar) raod at 128th Km (Jagadishpur) for the freight vehicle drivers to sustainable and safe highways under Road Division Habigonj During the Year 2020-2021.1/28/2023Habiganj2023
17Construction of 121.712m (3x39.634m) Long P.C. Girder Bridge ( Boliabari bridge) over the Atrai River at 6th Km (Ch.5+778.5) of Singra-Gurudaspur-Chatmohor Road (Z-5209) under "Raising of Road Embankment with Pavement Reconstruction & Widening at Singra portion of Singra-Gurudaspur- Chatmohor (Z-5209) Road Project" under Road Division, Natore during the year 2021-2022. (WP-3)3/10/2023Natore2023
18Widening with Re-construction, DBS Wearing Course, Construction of new Alignment Road, Rigid Pavement, Construction of 31.8 8 (1 x 30.488 m) Long P.C Girder Bridge (Nischintapur Bridge), 1 No. 6.00 m (Clear) Length x 5.00m (clear) Height & 2 Nos. 3.00 m. (clear) Length x 3.00 m (clear) Height R.C.C Box Culvert, Earth work in Road Embankment, Protective work by RCC Retaining wall, Brick Toe wall, Brick Retaining wall, RCC Palisiding, CC Block with Geo-Textile & U-Drain, Saucer Drain, installation of sign, Signal, Kilometer post, Gide post and Road Marking work at Ch: 0+000 to Ch: 10+500 of Daudkandi-Goalmari-Sreerayerchar (Cumilla)-Matlab Utter (Changarchar) Road (Z-1062) Development Project Programme under Road Division, Cumilla during the year 2020-2021.6/19/2023Cumilla2023
19Widening of existing 2 Lane Highway at Bagmara Bazar providing Rigid Pavement , Flexible Pavement, Construction of Bridge & Culvert , Retaining wall and installation of Sign , Signal, Directional Sign(Ch. 0 + 000 km to 59 + 000 km) of Lalmai-Laksam -Sonaimuri Regional Highway (R-141) under Road Division Cumilla1/27/2023Cumilla2023
20Widening of Road Embankment by Earth work, widening (2X0.900m ) of Existing Pavement, Road Surfacing by DBS(10.30m width), construction of hard shoulder(2X1.50m), Brick masonry U-shape Drain, Protective work, Sign-signal, KM post Road Marking work of Dhaka(Jatrabari)-Cumilla(Moinamati)-Chattogram-Coxbazar-Teknaf(N-1)(Chainage 250+445 to 256+809) under Dohazari Road Division during the year 2021-20222/6/2023Dohazari 2023
21Providing Strengthening, Dense Bituminous Surfacing (DBS), Protective work & Earth work under Periodic Maintenance Programme (PMP Major) at ch. 9+550 to 14+200, 14+300 to 15+800 & Construction of Rigid Pavement ch. 14+200 to 14+300 & 15+800 to 16+000 of Shariatpur (Burirhat)-Goshairhat Road (Z-8601) under Shariatpur Road Division, during the year 2021-20221/30/2023Shariatpur2023
22Re-Construction of Flexible Pavement at Ch.29+500 to 43+500 Km (Bhurungamari to Sonahat Bop Camp), Rigid Pavement at Ch. 36+000 to 36+200 Km & 38+500 to 38+800 Km (0.50 Km), 3 Nos Double Vent 2x3.00m (Clear) long & 3.00m (Clear) height RCC Box-Culvert at 42nd Km (Ch. 41+779), 43rd Km (Ch. 42+819) & 44th Km (Ch. 43+478) & Single Vent 1x6.00m (Clear) long & 6.00m (Clear) height RCC Box Culvert at 43rd Km (Ch.42+119) on Kurigram (Dasherhat)-Nageshwari-Bhurungamari-Sonahat Landport Road (N-506), Necessary Drain, Protective work & other supporting work with Improvement of Kurigram (Dasherhat)-Nageshwari-Bhurungamari-Sonahat Landport (N-506) Road into a National Highway under Road Division, Kurigram During the year 2019-2020.(WP-04)1/28/2023Kurigram2023
23Widening, New construction, Re-construction, Curve Simplification, Surfacing, Bus-bay, Protective work, Drainage structure and Guide post, Directional Sign board, Road Marking, Traffic sign, Kilometer post and overhead sign board at 1st KM to 5th(P) KM (Ch. 0+000 to 4+700) of Kabirhat-Chowmirmunshirhat-Sonaimuri Road (Z-1410) under Noakhali Road Division during the year 2021-2022.7/14/2023Noakhali2023
24Construction of different size RCC Box Culvert and Protective work at 1st to 24th km of Kabirhat-Chowmirmunshirhat-Sonaimuri Road (Z-1410) and 1st to 16th Km of Senbag-Begumgonj Gas Field-Sonaimuri Road (Z-1446) under Noakhali Road Division during the year 2021-2022.8/3/2023Noakhali2023
25Construction of Intersection, Bus-Bay, Culvert, RCC U-Drain, DBS-Wearing Course from ch. 0+000 m to ch. 22+748 m of Nilphamari-Domar (Including Domar Bypass) Road (Z-5707) and from ch. 26+340 m to ch. 29+290 m of Boda-Debigonj-Domar Road (Z-5003) Including overhead gantry, sign-signal installation, road marking etc under Road Division Nilphamari during the year 2021-2022. (Pakage-06).1/30/2023Nilphamari2023
26providing Widening of Pavement from Ch. 39+000m to 44+630m, Strengthening the Existing Pavement with Surfacing by DBS-Base Course, DBS-Wearing Course, 1(One) Nos RCC Box Culvert & Providing Sign-Signal, km post, Guide post, Protective Works at different Km of Tekerhat-Gopalgonj(Horidaspur)-Mollahhat(Gonapara) Road (Road No.R-850) under Road Division, Gopalgong during the year 2020-2021. (Package No.PW-06)7/18/2023Gopalganj2023
27Widening, New construction, Re-construction, Curve Simplification, Surfacing, Rigid Pavement, Bus-bay, Protective work, Drainage structure and Guide post, Directional Sign board, Road Marking, Traffic sign, Kilometer post and overhead sign board at 5th(P) KM to 24th KM (Ch.4+700-24+000) of Kabirhat-Chowmirmunshirhat-Sonaimuri Road under Noakhali Road Division during the year 2021-2022.6/29/2024Noakhali2024
28Widening, New construction, Re-construction, Curve Simplification, Surfacing, Bus-bay, Protective work, Drainage structure and Guide post, Directional Sign board, Road Marking, Traffic sign, Kilometer post and overhead sign board at 1st KM to 17th(P) KM (Ch. 0+000 to 16+023) of Senbag-Begumganj gasfield-Sonaimuri Road (Z-1446) under Noakhali Road Division during the year 2021-2022.9/26/2023Noakhali2023
29Periodic Maintenance Programme (PMP-Major/2021-2022) DBST with DBS-Base Course including improvement of pavement by Widening (Both Side) from Ch. 03+640m to 21+235m and 28+065m to 34+621m of Bhatiapara-Kalna-Lohagara-Narail-Jashore Road (N-806), Ch. 0+000m to 3+920m of Narail Town Bypass Road (Z-7505) and Ch. 0+000m to 3+120m of Narail-Fultola Road (Z-7030) undr Road Division, Narail during the year 2021-2022.6/11/2024Narail2024
30Construction of Underpass at Ch. 90+150 km (Beltoli Near Cumilla University) of Dhaka-Chattogram National Highway (N-1) under Road Division, Cumilla during the year 2021-2022.12/14/2023Cumilla2023
31Periodic Maintenance Programme (PMP) Providing Dense Bituminous Surfacing Work (DBSW) under Sheikh Hasina Highway Road (R-860) at Ch. 16+500 to Ch. 17+642 , Ch. 20+860 to Ch. 22+500 & Monohar Bazar More-Shariatpur (Premtola) Road (R-861) at Ch. 00+000 to Ch. 04+839 under Shariatpur Road Division, during the year 2021-2022 1/28/2023Shariatpur2023
32Construction of U-Loop including Service Road, Retaining wall, Drain, Sign Signal, Road Marking, Guide Post & Design Based Beautification work at Paduar Bazar Intersection of Dhaka - Chattogram National Highway (N1) under Road Division Cumilla during the year 2021-2022.6/30/2024Cumilla2024
33Periodic Maintenance works under PMP (Road-Major) providing construction of Hard Shoulder, HBB and RCC Palisading at Ch.100+040 to 102+140 of Dhaka(Mirpur)-Utholi-Paturia-Natakhola-Kashinathpur-Bogra-Rangpur-Beldanga-Banglabandh Road (N-5) and Ch. 0+000 to 1+800 of Baderhat-Kazirhat (Latifpur) Road (N-505) under Pabna Road Division during the year 2021-2022.1/21/2022Pabna2022
34Periodic Maintenance Works under PMP (Road-Major) Providing Hard Shoulder, HBB and Rehabilitation of Roundabout at Ch.109+480 of Dhaka (Mirpur)- Utholi- Paturia- Natakhola- Kashinathpur -Bogra- Rangpur- Beldanga -Banglabandh Road (N-5) and Pavement Widening, Strengthening, Surfacing & Installation of Traffic Sign Signal at Ch 72+712 ofJhenaidah-Kustia-Paksey Ferry-Dasuria Road (N-704) under Pabna Road Division during the year 2021-2022.1/7/2022Pabna2022
35Periodic Maintenance Program(PMP-Major Road) Providing Beautification of Bhatiapara Intersection with Sign -Signal,Guard Rail etc, Widening of Flexible Pavement Both end of Bhatiapara Over Bridge From Ch. 35+430 to 35+730 & Ch. 36+330 to 36+604 & Culvert Extension Ch. 36+855 of Bhanga-Bhatiapara-Gopalganj-Mollahat-Naopara-Khulna(N-805) Road Under Gopalganj Road Division during the Financial year 2021-22.3/26/2023Gopalganj2023
36Construction of Rigid Pavement & Protective Works different km of Gafargaon-Bormi-Mawna Road (R-314) under Mymensingh Road Division during the year 2021-2022 (WP-11)2/23/2023Mymensingh2023
37Construction of 4 Nos Foot Over Bridge at Alamnagar, Police Town, Bank Town & Ulail of Dhaka (Mirpur) - Uthuli - Paturia - Banglabandha National Highway (N-5) under Dhaka Road Division, Dhaka during the year 2022-2023 (WP-21)6/29/2023Dhaka2023
38Construction of a PC Girder Bridge at 41st km of Sonahat (Landport)-Motherganj-Bhitorbandh-Nageswari Zilla Highway (Z-5624) and 2 (two) RCC Box culverts at 5th km and 8th km and a PC Girder Bridge of Nageshwari-Newashi-Kharibari-Fulbari Zilla Highway (Z-5617) accommodated in a Replacement of dilapidated, narrow and existing Bailey Bridges at important points and other vulnerable Bridges (Rangpur Zone) Project (WP-13) under Road Division, Kurigram5/14/2024Kurigram2024
39Construction of 01(One) no. 31.828m (1 x 30.488m) Long P.C Girder Bridge (BULLAI BRIDGE) at 22nd km (Ch. 21+556 km) & 1(one) no 3x5.00m (clear) length & 5.00m (clear) height RCC Box culvert with U-type Wing wall at Ch. 19+024 m on Gangachora-Pirerhat-Monthonarhat-Garagram-Kishorgonj Road (Z 5018), 01(One) no. 25.74m (1x24.40m) Long P.C Girder Bridge (PULERHAT BRIDGE) at 21st km (Ch.20+644km) on Birgonj-Khnashama-Darwani Road (Z 5008), 01(One) no. 94.274 m (3x30.488m) Long P.C Girder Bridge (BOGULAGARI BRIDGE) at 20th km (Ch. 19+661km) on Nilphamari-Jaldhaka Road (Z 5701), 01(One) no. 51.61 m (2x12.20+24.40 m) Long P.C Girder Bridge (DHAIZAN BRIDGE) at Ch. 8+900 m on Nilphamari (Tengonmari)-Kishoregonj Road (Z 5022) and Re-construction of Three vent 3x6.00m (clear) length & 5.00m (clear) height RCC Box culvert with U-type wing wall at 15th km (Ch.14+2400) of Jaldhaka-Dimla-Tunirhat Road (Z-5703) under Road Division, Nilphamari during the year 2021-2022 (WP-05).5/21/2024Nilphamari2024
40Construction of U-loop at 3rd km (p) & 8th km (p) and construction of Service lane along with U-loop at 10th km(p) & 11th km (p) of Dhaka (Mirpur) - Uthuli - Paturia - Banglabandha National Highway (N-5) under Dhaka Road Division, Dhaka during the year 2022-2023 (WP-19).5/17/2023Dhaka2023